Skip to content
← All projects

West Ruislip Portal AREA WEST

The West Ruislip tunnel portal and Area West works on HS2 Phase One, where the London bored tunnels met the surface route in West London. Delivered by the SCS joint venture.

Wentworth supported SCS at West Ruislip and Copthall with geotechnical and construction engineering. We helped the delivery teams adapt earthworks and access arrangements to changing work fronts, with ongoing design support as ground conditions and construction demands developed.

Client / Developer
HS2 Ltd
Our Client
SCS JV

West Ruislip Portal AREA WEST

The West Ruislip tunnel portal and Area West works on HS2 Phase One, where the London bored tunnels met the surface route in West London. Delivered by the SCS joint venture.

Wentworth supported SCS at West Ruislip and Copthall with geotechnical and construction engineering. We helped the delivery teams adapt earthworks and access arrangements to changing work fronts, with ongoing design support as ground conditions and construction demands developed.