The decommissioning and demolition of the former Slough industrial power station on the Slough Trading Estate, clearing the way for redevelopment.
Wentworth provided construction and structural engineering for Keltbray at Slough Power Station. Our work followed the changing site from demolition into new works, helping the team develop a coordinated approach to the existing structures, ground conditions and replacement construction.


