Asset-protection and mitigation design for structures above HS2's London tunnels (S1 & S2), assessing and protecting sensitive third-party assets such as bridges from the effects of tunnelling. For the SCS joint venture.
Wentworth supported SCS with structural and geotechnical assessment for HS2 asset mitigation. Our work provided an engineering basis for understanding how existing bridges could respond to tunnelling, with independent checking supporting the evaluation of proposed construction conditions.

