Delivery of temporary works engineering in a live railway environment to support the construction of two major bridge structures on the Transpennine Route Upgrade: the Ravensthorpe Flyover and the Baker Viaduct.
Wentworth supported Sword Construction on the Ravensthorpe Flyover and Baker Viaduct substructures. Our detailing and construction engineering brought the permanent concrete design together with its installation strategy, helping the team resolve buildability and provide the information needed for railway assurance.