Wentworth supported the Allerdene Bridge project

28.03.25
Wentworth is proud to have supported the Allerdene Bridge project by delivering innovative and challenging temporary work solutions. A truly rewarding achievement.

Wentworth provided the below services:

  • Developed the demolition sequence design and drawings, assessing the partial structure under demolition loading.
  • Prepared CAD drawings of the existing bridge structure, traced from historic drawings.