Wentworth supported the Allerdene Bridge project
Wentworth is proud to have supported the Allerdene Bridge project by delivering innovative and challenging temporary work solutions. A truly rewarding achievement.
Wentworth provided the below services:
Developed the demolition sequence design and drawings, assessing the partial structure under demolition loading. Prepared CAD drawings of the existing bridge structure, traced from historic drawings. Acted as Contractor's Responsible Engineer for Design (CRE-D) in the Network Rail approval process.